Darwin International Airport

11kV Network Upgrades
Darwin Airport | BT Energy

Project Overview

The KLE 231 project involved high voltage (HV) and low voltage (LV) switchboard replacements across a live gas plant, requiring minimal disruption to production. Imperium was engaged to deliver the electrical engineering, detailed design, and cutover implementation strategy for two critical substations servicing LNG and LPG operations.

Scope

Imperium delivered the engineering and execution strategy to enable controlled switchboard replacement within live operational environments.

Both substations were critical to plant operation, requiring careful sequencing and risk mitigation.

  • HV and LV switchboard replacement design
  • Electrical engineering and detailed design documentation
  • Development of staged cutover strategy
  • Implementation planning to minimise production impact
  • Substation 50 – LNG Storage & Loading
  • Substation 57 – Propane/Butane Storage & Loading and LNG Boil Off Gas Handling

Deliverables

✏️
HV and LV switchboard detailed design
Substation 50 upgrade package
Substation 57 upgrade package
♟️
Production-sensitive cutover strategy
♟️
Staged implementation methodology
📝
Electrical engineering documentation for construction execution

Outcome

Critical Substation Upgrades Delivered with Minimal Production Impact

Imperium commenced after other disciplines and successfully completed the electrical scope on time and under budget.

Close coordination with project stakeholders ensured seamless integration within the broader program. The client and key project partners were highly satisfied with the outcome and Imperium’s contribution to the overall project success.