Darwin International Airport 11kV Network Upgrades
AS/NZS ISO 45001:2018, AS/NZS ISO 9001:2015
Project name :Project Name Darwin International Airport 11kV Network Upgrades
Client :BT Energy
Project Location :Darwin Airport
Staff:Aaron, Alan, Nathan, Greg, Jarrad, Warren
Start date :11 Feb 2019
End date :Ongoing
Scope
Engineering, design and commissioning cutover strategy for the replacement of the main 11kV RMU’s to a new 11kV switchboard with full generator/grid synchronisation automation, protection and earthing studies. Network code export compliance engineering for the embedded solar PV generation sites which summed to 7MW of solar generation.
Result
The project is ongoing due to the requirement to attend site to cutover to the new switchboard and Covid-19. The solar PV network compliance engineering is complete and compliant.
How We Did It Better
The manner in which the project was managed was unconventional with the lack of defined deliverables and therefore scope. Imperium engineering were required to respond to engineering and design requests on an adhoc basis, put simply we needed to remain flexible and advise our client of what is required as a minimum and what is possible within the confines of the networks ability to function and technical constraints.