Buru Energy progressed drilling of Wells Ungani 6H and 7H to sustain production at the Ungani Oil Production Facility. Imperium was engaged to deliver Electrical and Instrumentation (E&I) engineering and design to integrate the new plant with the existing operational facility.
The works included hazardous area engineering and compliance design for newly installed equipment.
Imperium provided full E&I engineering and design services to incorporate the new wells and associated plant into the live production facility.