Buru Energy contracted Imperium Engineering in 2019 to assist in the electrical upgrade of Buru Energy’s main asset, the Ungani Production Facility. Imperium delivered Buru with a quality product, kept the design ‘fit for purpose’ whilst maintaining compliance by adhering to electrical design and industry standards. Buru Energy looks forward to working with Imperium on future projects.